Open
Milestone
Jan 30, 2026–May 30, 2026
[AC][OP] BDRC U4
e-suite to start 1st June o-suite to start 30th June
Preliminary list of proposed changes:
-
AS3 -> AS4 (3.1.0 or 3.2.0) -
Ensemble recalibration (DCAL=0.35) -
Fixed post-processing of first time step -
new optics with less absorbing dust -
Workflow more resistant to DA failures (use past days or propagate free ensemble)
Loading
Loading
Loading
Loading